Evaluate critical loads, run times, and fuel options.
Generator selection, ATS, fuel system, and controls.
Approvals, interconnection, and local compliance.
Pad, fuel containment, and conduit/trenching.
Mount generator, ATS integration, and distribution tie‑in.
Load bank testing, automatic transfer verification, and training.
As‑built docs, O&M manuals, and optional maintenance plans.